P—01 · IN VIEW
Double Barrel · Oliver, BC
18.5MW Agrivoltaic · 50MW Data Centre
Integrated Developer · North America

Powering the digital economy with renewable infrastructure.

BS"D Ventures develops, builds, and operates solar, storage, and AI-ready data centres on shared sites — from the Okanagan winery country to Edmonton International Airport.

Scroll
Under Development
500MW
Active development across four sites in North America
AI-Ready Capacity
150MW
Purpose-built AI data centre load through 2028
Pipeline
1GW
Alberta solar + BESS · Ready-to-Build 2027 / 2028
Renewable Share
100%
On-site generation across every operating asset
§ 01 — About BS"D

The megawatt and the rack, on the same site.

BS"D Ventures is an integrated developer of solar, battery storage, and AI-ready data centres across North America — designed, permitted, and operated as one system.

Compute demand is scaling faster than the grid can deliver power to it. Rather than compete for scarce interconnection, we co-locate generation with the load — collapsing transmission risk, permitting timelines, and counterparty complexity into a single platform.

Four active sites in advanced permitting today. A 1 GW pipeline entering Ready-to-Build in 2027 / 2028. And a mission that begins the moment a site is optioned: renewable power, community equity, and hyperscaler-grade uptime — designed together.

Compute is the new industry. Power is the constraint. We build both — on the same land, under the same platform. — BS"D Ventures Development Thesis · 2026
§ 02 — Approach

Vertically integrated. End to end.

Every BS"D site pairs on-site generation with dispatchable storage and mission-critical data centre load — designed together, permitted together, operated together.

01

Generation

Solar and wind assets we develop and own, sized to the exact hourly load profile of the co-located data centre from feasibility onward.

02

Storage

Grid-forming BESS at the point of interconnection provides 24/7 firming, ancillary services, and stacked revenue across markets.

03

Compute

Purpose-built, liquid-cooled AI capacity with campus-scale interconnection and hyperscaler-grade uptime commitments.

04

Community

Indigenous equity partnerships, agrivoltaic dual-use, and district energy built into every project from Day 1 — not bolted on afterwards.

§ 03 — Portfolio

Four sites. One thesis.

Each BS"D project is vertically integrated: generation, storage, and mission-critical load on one site — from the Okanagan winery country to Alberta's largest airport.

Double Barrel agrivoltaic solar over Okanagan vineyard at sunset
ALC Approved · Advanced Permitting
Oliver, BC · 49.18°N
P—01 / Agrivoltaic + AI Data Centre

Double Barrel

Oliver, British Columbia · Okanagan Valley

Canada's first agrivoltaic-integrated data centre. Solar canopies protect Okanagan vines from heat and hail while producing 18.5MW of clean generation. The co-located 50MW data centre is in advanced permitting.

Solar (Agri)
18.5MW
Data Centre
50MW
Milestone
ALC Approved
View project detail →
Edmonton International Airport with adjacent solar array at golden hour
Solar Approved · DC Advanced Permitting
Edmonton, AB · 53.31°N
P—02 / Airport-Integrated AI Data Centre

YEG Airport AI

Edmonton International · Alexander First Nations Partnership

The first data centre of its kind integrated with an international airport, supporting district energy and powered by 100% renewable energy. The solar development, delivered in partnership with Alexander First Nation, includes equity, procurement, and workforce participation, and is fully approved. The 75MW AI data centre is in advanced approval stages.

Solar
88MW
Data Centre
75MW
Milestone
Solar Approved
View project detail →
Alberta prairie at sunset with transmission infrastructure
Pipeline · RTB 2027 / 2028
Alberta · Multi-site
P—03 / Utility-Scale Solar + BESS

Project Sol

Alberta · Multi-site portfolio

Utility-scale solar and battery-storage development across multiple Alberta sites, positioned to reach Ready-to-Build in the 2027–2028 window. Queue positions secured; interconnection studies in-flight.

Solar + BESS
1GW
RTB Window
'27 / '28
Stage
Pipeline
View project detail →
Wind turbines on the Prince Edward Island coast at sunrise
Feasibility Complete
Prince Edward Island · 46.24°N
P—04 / Coastal Wind Development

PEI Coastal Wind

Prince Edward Island · Atlantic Canada

15MW coastal wind development on Prince Edward Island. Feasibility complete; interconnection studies and community consultation are ongoing.

Capacity
15MW
Technology
Wind
Stage
Feasibility
View project detail →
§ 04 — Impact

Renewable infrastructure only works when the communities hosting it do too.

Every BS"D project is structured for durable local participation. Indigenous partnership, agrivoltaic dual-use, and district energy aren't add-ons — they're the design.

01 · INDIGENOUS PARTICIPATION

Alexander First Nations

Equity holder and development partner in the YEG Airport Solar project. Structured procurement, workforce, and long-term revenue commitments woven into the deal from feasibility onward.

02 · AGRIVOLTAIC

Okanagan winery co-use

Double Barrel solar canopies protect vines from heat and hail — extending the growing season while producing 18.5MW of clean power on the same acreage.

03 · DISTRICT ENERGY

YEG waste-heat recovery

First-of-its-kind waste-heat loop supplies Edmonton International terminal heating from data centre operations — a genuine circular energy design.

§ 05 — For Investors

We are actively raising for our North American platform.

Institutional capital partners, hyperscaler off-takers, and community stakeholders — BS"D welcomes early conversations across every site and structure.

Target IRR
14.5%
Avg. PPA Term
20yr
Contracted
125/500 MW
Renewable-Powered AI Campus · Concept
§ Portfolio

The Portfolio

Four active sites across British Columbia, Alberta, and Prince Edward Island — plus a 1 GW pipeline entering Ready-to-Build in 2027 / 2028. Each project is vertically integrated: generation, storage, and mission-critical load.

Double Barrel · BC

Oliver, British Columbia · 18.5MW Agrivoltaic + 50MW Data Centre

Canada's first agrivoltaic-integrated data centre, co-located with a Double Barrel winery in the South Okanagan. Solar canopies protect vines from heat and hail while producing 18.5MW of clean generation. Agricultural Land Commission approval secured for the agrivoltaic component; the 50MW data centre is in advanced permitting.

YEG Airport AI · AB

Edmonton International Airport · 88MW Solar + 75MW Data Centre

The first data centre of its kind integrated with an international airport, supporting district energy and powered by 100% renewable energy. The solar development, delivered in partnership with Alexander First Nation, includes equity, procurement, and workforce participation, and is fully approved. The 75MW AI data centre is in advanced approval stages.

Project Sol · AB

Alberta · 1 GW Solar + BESS Pipeline

Utility-scale solar and battery storage across multiple Alberta sites, positioned to reach Ready-to-Build in the 2027–2028 window. Queue positions secured; interconnection studies in-flight.

PEI Coastal Wind · PEI

Prince Edward Island · 15MW Wind

Coastal wind development in Atlantic Canada. Feasibility complete; grid interconnection and community consultation ongoing.

§ Approach

Our Approach

We are an integrated developer. Every megawatt-hour is generated, stored, and consumed on the same site — collapsing counterparty risk, transmission cost, and time-to-power.

Interconnection-led origination

We start every site from the substation, not the map. Queue position, transmission headroom, and land use are evaluated before land is optioned — meaning our sites reach RTB faster than the industry median.

Dual-use land integration

Double Barrel's winery agrivoltaic and YEG's airport district heat prove BS"D's best-in-class sites extend existing land use rather than compete with it. This unlocks land, community buy-in, and permitting speed.

Community & Indigenous equity

Our YEG Airport solar development is delivered in partnership with the Alexander First Nations. Every BS"D project includes structured community participation from day one.

Vertical integration

Generation, storage, and load are owned by the same platform. Hyperscaler tenants get a single 20-year PPA counterparty; investors get margin captured at every stage.

§ 04 — Impact

Impact & Community

Renewable infrastructure only works when the communities hosting it benefit from it. Our projects are structured for durable local participation.

First Nation Participation

Partner and equity holder in the YEG Airport AI development. Structured procurement, workforce, and long-term revenue commitments.

District energy

YEG waste-heat recovery loop supplies airport terminal heating — the first project of its kind in Canada.

Agrivoltaic dual-use

Double Barrel solar canopies protect Okanagan vines from heat and hail — extending the growing season while producing 18.5MW of clean power.

Carbon impact

500MW under development offsets an estimated 720,000 tonnes of CO₂ annually at RTB — equivalent to taking ~150,000 gasoline vehicles off the road.

§ Investors

For Investors

BS"D is actively raising for its North American integrated development platform. Institutional capital partners, hyperscaler off-takers, and community stakeholders — we welcome early conversations.

Platform snapshot

  • 500 MW under active development · 4 sites
  • 150 MW AI-ready capacity through 2028
  • 1 GW Alberta pipeline · RTB 2027 / 2028
  • 15 MW PEI coastal wind

Capital structure

Platform equity, project-level tax equity, senior construction debt, and long-term take-out debt structured on a project-by-project basis. Data room available under NDA.

Request briefing pack

Contact [email protected] for the current management presentation, portfolio detail, and financial model.

§ About

About BS"D

BS"D Ventures Ltd. is a mid-stage integrated developer building solar and battery-powered AI data centres across North America. Advanced permitting on four active sites.

Company

Founded to close the gap between renewable generation and hyperscaler AI compute demand. Headquartered in Calgary with development teams in Vancouver and Edmonton.

Leadership

Team profiles available on request. Combined 80+ years of experience across utility-scale renewables, data centre operations, and infrastructure finance.

Timeline

2026 — Advanced permitting across four sites, first PPA discussions.
2027 — Project Sol RTB milestones, YEG Airport construction start.
2028 — Double Barrel operational, 150MW AI capacity online.

§ Press

News & Press

Selected recent milestones and press coverage. Full press kit available on request.

May 2026

Double Barrel receives Agricultural Land Commission approval — first BC agrivoltaic-integrated site.

Mar 2026

BS"D signs partnership MOU with Data Centre off taker for YEG Airport AI development.

Jan 2026

YEG solar 88MW receives full development approval; district energy design initiated.

Dec 2025

BS"D closes Series A platform equity to fund North American development pipeline.

§ Careers

Careers at BS"D

We are hiring across development, engineering, and commercial. Remote-first with hubs in Calgary, Vancouver, and Edmonton.

Development

Senior Development Manager · Alberta · full-time
Interconnection Engineer · Calgary or remote
Permitting Lead · BC · full-time

Data Centre

Head of Data Centre Operations · Edmonton
Critical Systems Engineer · Edmonton
Commercial Lead, Hyperscaler Sales · remote

Community

Indigenous Relations Manager · Alberta
Stakeholder Engagement Lead · BC

§ Contact

Contact BS"D

We are open for conversations with institutional capital, hyperscaler off-takers, permitting bodies, community stakeholders, and media.

Investors

[email protected] — Briefing pack, data room access, capital partnership.

Enterprise & Hyperscalers

[email protected] — Capacity offtake, PPA structures, campus interconnection.

Community & Permitting

[email protected] — First Nations partnerships, municipal engagement, permitting.

Media

[email protected] — Media enquiries and press kit.

Offices

Calgary (HQ) · Vancouver · Edmonton