Double Barrel
Canada's first agrivoltaic-integrated data centre. Solar canopies protect Okanagan vines from heat and hail while producing 18.5MW of clean generation. The co-located 50MW data centre is in advanced permitting.
BS"D Ventures develops, builds, and operates solar, storage, and AI-ready data centres on shared sites — from the Okanagan winery country to Edmonton International Airport.
BS"D Ventures is an integrated developer of solar, battery storage, and AI-ready data centres across North America — designed, permitted, and operated as one system.
Compute demand is scaling faster than the grid can deliver power to it. Rather than compete for scarce interconnection, we co-locate generation with the load — collapsing transmission risk, permitting timelines, and counterparty complexity into a single platform.
Four active sites in advanced permitting today. A 1 GW pipeline entering Ready-to-Build in 2027 / 2028. And a mission that begins the moment a site is optioned: renewable power, community equity, and hyperscaler-grade uptime — designed together.
Every BS"D site pairs on-site generation with dispatchable storage and mission-critical data centre load — designed together, permitted together, operated together.
Solar and wind assets we develop and own, sized to the exact hourly load profile of the co-located data centre from feasibility onward.
Grid-forming BESS at the point of interconnection provides 24/7 firming, ancillary services, and stacked revenue across markets.
Purpose-built, liquid-cooled AI capacity with campus-scale interconnection and hyperscaler-grade uptime commitments.
Indigenous equity partnerships, agrivoltaic dual-use, and district energy built into every project from Day 1 — not bolted on afterwards.
Each BS"D project is vertically integrated: generation, storage, and mission-critical load on one site — from the Okanagan winery country to Alberta's largest airport.
Canada's first agrivoltaic-integrated data centre. Solar canopies protect Okanagan vines from heat and hail while producing 18.5MW of clean generation. The co-located 50MW data centre is in advanced permitting.
The first data centre of its kind integrated with an international airport, supporting district energy and powered by 100% renewable energy. The solar development, delivered in partnership with Alexander First Nation, includes equity, procurement, and workforce participation, and is fully approved. The 75MW AI data centre is in advanced approval stages.
Utility-scale solar and battery-storage development across multiple Alberta sites, positioned to reach Ready-to-Build in the 2027–2028 window. Queue positions secured; interconnection studies in-flight.
15MW coastal wind development on Prince Edward Island. Feasibility complete; interconnection studies and community consultation are ongoing.
Every BS"D project is structured for durable local participation. Indigenous partnership, agrivoltaic dual-use, and district energy aren't add-ons — they're the design.
Equity holder and development partner in the YEG Airport Solar project. Structured procurement, workforce, and long-term revenue commitments woven into the deal from feasibility onward.
Double Barrel solar canopies protect vines from heat and hail — extending the growing season while producing 18.5MW of clean power on the same acreage.
First-of-its-kind waste-heat loop supplies Edmonton International terminal heating from data centre operations — a genuine circular energy design.
Institutional capital partners, hyperscaler off-takers, and community stakeholders — BS"D welcomes early conversations across every site and structure.
Four active sites across British Columbia, Alberta, and Prince Edward Island — plus a 1 GW pipeline entering Ready-to-Build in 2027 / 2028. Each project is vertically integrated: generation, storage, and mission-critical load.
Oliver, British Columbia · 18.5MW Agrivoltaic + 50MW Data Centre
Canada's first agrivoltaic-integrated data centre, co-located with a Double Barrel winery in the South Okanagan. Solar canopies protect vines from heat and hail while producing 18.5MW of clean generation. Agricultural Land Commission approval secured for the agrivoltaic component; the 50MW data centre is in advanced permitting.
Edmonton International Airport · 88MW Solar + 75MW Data Centre
The first data centre of its kind integrated with an international airport, supporting district energy and powered by 100% renewable energy. The solar development, delivered in partnership with Alexander First Nation, includes equity, procurement, and workforce participation, and is fully approved. The 75MW AI data centre is in advanced approval stages.
Alberta · 1 GW Solar + BESS Pipeline
Utility-scale solar and battery storage across multiple Alberta sites, positioned to reach Ready-to-Build in the 2027–2028 window. Queue positions secured; interconnection studies in-flight.
Prince Edward Island · 15MW Wind
Coastal wind development in Atlantic Canada. Feasibility complete; grid interconnection and community consultation ongoing.
We are an integrated developer. Every megawatt-hour is generated, stored, and consumed on the same site — collapsing counterparty risk, transmission cost, and time-to-power.
We start every site from the substation, not the map. Queue position, transmission headroom, and land use are evaluated before land is optioned — meaning our sites reach RTB faster than the industry median.
Double Barrel's winery agrivoltaic and YEG's airport district heat prove BS"D's best-in-class sites extend existing land use rather than compete with it. This unlocks land, community buy-in, and permitting speed.
Our YEG Airport solar development is delivered in partnership with the Alexander First Nations. Every BS"D project includes structured community participation from day one.
Generation, storage, and load are owned by the same platform. Hyperscaler tenants get a single 20-year PPA counterparty; investors get margin captured at every stage.
Renewable infrastructure only works when the communities hosting it benefit from it. Our projects are structured for durable local participation.
Partner and equity holder in the YEG Airport AI development. Structured procurement, workforce, and long-term revenue commitments.
YEG waste-heat recovery loop supplies airport terminal heating — the first project of its kind in Canada.
Double Barrel solar canopies protect Okanagan vines from heat and hail — extending the growing season while producing 18.5MW of clean power.
500MW under development offsets an estimated 720,000 tonnes of CO₂ annually at RTB — equivalent to taking ~150,000 gasoline vehicles off the road.
BS"D is actively raising for its North American integrated development platform. Institutional capital partners, hyperscaler off-takers, and community stakeholders — we welcome early conversations.
Platform equity, project-level tax equity, senior construction debt, and long-term take-out debt structured on a project-by-project basis. Data room available under NDA.
Contact [email protected] for the current management presentation, portfolio detail, and financial model.
BS"D Ventures Ltd. is a mid-stage integrated developer building solar and battery-powered AI data centres across North America. Advanced permitting on four active sites.
Founded to close the gap between renewable generation and hyperscaler AI compute demand. Headquartered in Calgary with development teams in Vancouver and Edmonton.
Team profiles available on request. Combined 80+ years of experience across utility-scale renewables, data centre operations, and infrastructure finance.
2026 — Advanced permitting across four sites, first PPA discussions.
2027 — Project Sol RTB milestones, YEG Airport construction start.
2028 — Double Barrel operational, 150MW AI capacity online.
Selected recent milestones and press coverage. Full press kit available on request.
Double Barrel receives Agricultural Land Commission approval — first BC agrivoltaic-integrated site.
BS"D signs partnership MOU with Data Centre off taker for YEG Airport AI development.
YEG solar 88MW receives full development approval; district energy design initiated.
BS"D closes Series A platform equity to fund North American development pipeline.
We are hiring across development, engineering, and commercial. Remote-first with hubs in Calgary, Vancouver, and Edmonton.
Senior Development Manager · Alberta · full-time
Interconnection Engineer · Calgary or remote
Permitting Lead · BC · full-time
Head of Data Centre Operations · Edmonton
Critical Systems Engineer · Edmonton
Commercial Lead, Hyperscaler Sales · remote
Indigenous Relations Manager · Alberta
Stakeholder Engagement Lead · BC
We are open for conversations with institutional capital, hyperscaler off-takers, permitting bodies, community stakeholders, and media.
[email protected] — Briefing pack, data room access, capital partnership.
[email protected] — Capacity offtake, PPA structures, campus interconnection.
[email protected] — First Nations partnerships, municipal engagement, permitting.
[email protected] — Media enquiries and press kit.
Calgary (HQ) · Vancouver · Edmonton